Construction Update


Follow the construction progress of the new Musée Ukraina Museum.

March 15, 2011 - Floor Grouting
March 15, 2011 - Floor Grouting

Thawing out the ground floor
Thawing out the ground floor

Second floor windows
Second floor windows

March 30, 2011 - Second floor ICF Block walls near completion
March 30, 2011 - Second floor ICF Block walls near completion

Reinforcing the wall before the concrete pour
Reinforcing the wall before the concrete pour

March 31, 2011 - Second floor concrete pour
March 31, 2011 - Second floor concrete pour

View from second floor
View from second floor

Second floor - looking at the elevator shaft
Second floor - looking at the elevator shaft

April 7, 2011 - Main floor - pouring the concrete slab
April 7, 2011 - Main floor - pouring the concrete slab


Close up of floor structure before pour
Close up of floor structure before pour

Fog creeps into the building
Fog creeps into the building

April 11, 2011 - Steel arrives
April 11, 2011 - Steel arrives


April 14, 2011 - Mechanical Room frame and Turrets seen from rear of building
April 14, 2011 - Mechanical Room frame and Turrets seen from rear of building

Canopy over front entrance
Canopy over front entrance