Construction Update
Follow the construction progress of the new Musée Ukraina Museum.
March 15, 2011 - Floor Grouting
Thawing out the ground floor
Second floor windows
March 30, 2011 - Second floor ICF Block walls near completion
Reinforcing the wall before the concrete pour
March 31, 2011 - Second floor concrete pour
View from second floor
Second floor - looking at the elevator shaft
April 7, 2011 - Main floor - pouring the concrete slab

Close up of floor structure before pour
Fog creeps into the building
April 11, 2011 - Steel arrives

April 14, 2011 - Mechanical Room frame and Turrets seen from rear of building
Canopy over front entrance